February 01, 2016
To optimize the mapping collection parameters, it is important to factor the size of the mapping area, the beam diameter, and the desired beam spacing. For this sample, the area being mapped is shown in red outline in Figure 2, approximately 50.4 x 3.5 mm.
February 01, 2015
Ancient Roman builders designed maritime concrete harbor structures to remain intact in the aggressive seawater environment for very long periods of time.
September 01, 2014
Ancient Roman builders designed maritime concrete harbor structures to remain intact in the aggressive seawater environment for very long periods of time.